  • 2026-09-09 Mobile build steps 2 through 5 shipped: subject onboarding, the read-next home list, weighted read coverage (decision), and the question screen with exam marks dropped for question type (decision). The interleaved, all-subjects read-next list shipped this day was replaced the same day by a one-subject focus default (build).
  • 2026-09-07 Corpus ingest: nine books, 3,955,261 tokens (numbers), and a new M3 Access milestone was inserted ahead of the answer pipeline so the admin review surface for grading retrieval and spot-checking answers has somewhere to happen.
  • 2026-09-06 M1, the question bank, verified complete: 809 questions, 34 chapters, 218 topics (numbers).
  • 2026-09-06 v2 repository scaffolded and its question hierarchy built same day: Next.js 16 app with a test harness, a version-controlled pre-push hook and CI gate, a migration runner with safety checks (details), and a parser and import command that turned the AKU past-paper corpus into the question hierarchy schema. The corpus itself was confirmed to live outside the repository, since it is university material and the repository is meant to be public (details).

Earlier milestones: v1 and earlier.

This page was written by a model from my own repositories and checked by a second one against the same sources. I did not write it, and no version of it was approved by me before it went up. How that works, and where it can still be wrong.